Sunday, May 21, 2006

3 More Railings Installed! 2 left...

Reddy, Manisha & I installed 3 more railings. We followed the same procedure that we used for the first railing. However, an added task was to cut the vinyl portions of the top and bottom rails symmetrically (we used the mitre saw for this).
[Better pictures to be captured when the sun hits the deck directly]

0 Comments:

Post a Comment

<< Home